Distributed energy resources (DERs) Rooftop solar BTM battery EV charging Demand response Heat pumps Small CHP Building EMS Small gen DERA Aggregator ≥100 kW pool Wholesale market Energy · capacity Ancillary services CAISO · NYISO · ISO-NE Implementation timeline by ISO CAISO done NYISO end 2026 ISO-NE Nov 2026 PJM Feb 2028 MISO 2027–29 SPP Q2 2030 ERCOT: not subject (outside FERC jurisdiction) — operates own DER pilot via PUCT

The short version

FERC Order 2222, issued in September 2020, required every FERC-jurisdictional grid operator — CAISO, NYISO, ISO-NE, PJM, MISO, and SPP — to revise market rules so that aggregations of distributed energy resources can participate in wholesale capacity, energy, and ancillary services markets. The minimum aggregation size is 100 kW. The intent: unlock the value of small distributed resources (rooftop solar, behind-the-meter batteries, demand response, EV charging, controllable building loads) by allowing them to be bundled and competed against utility-scale generation.

The promise has been slow to materialize. Five years after the Order, only CAISO and NYISO have meaningful DER aggregator participation. PJM, MISO, ISO-NE, and SPP have delayed implementation through multiple compliance filings, with full implementation now scheduled for 2026 through 2030. State retail programs (net metering, behind-the-meter incentives) often pay more than wholesale market participation, limiting demand for DERA programs even where they exist.

What Order 2222 actually requires

Each FERC-jurisdictional ISO must establish a tariff allowing DERAs (Distributed Energy Resource Aggregators) to register as wholesale market participants. The tariff must accommodate physical and operational characteristics of various DER types — generation, storage, demand response, energy efficiency, and EV charging. Aggregations must meet minimum size of 100 kW. The ISO must establish coordination protocols among the grid operator, aggregator, distribution utility, and relevant retail regulator. Critically, Order 2222 prohibits states from broadly excluding DERs from wholesale market participation, though states retain authority over individual DER interconnection.

The structural challenge: a DER aggregator must coordinate with three different parties — the wholesale market (ISO), the local distribution utility, and the state retail regulator — and meet performance standards while doing so. This complexity has delayed implementation as each ISO works through stakeholder processes to define telemetry requirements, double-counting prevention rules, distribution coordination protocols, and settlement procedures.

Implementation status by ISO

CAISO has implemented Order 2222, building on its pre-existing DER Aggregation program operational since 2021. CAISO requires aggregations to operate within a single Sub-LAP, with telemetry standards for aggregations exceeding 10 MW or providing ancillary services. NYISO targets full Order 2222 compliance by end of 2026, building on a DER aggregation program that has been operational since 2021. ISO-NE targets November 1, 2026 for energy market participation, with capacity market participation beginning February 1, 2027 for the 2028/2029 capacity year.

PJM has been the slowest large ISO — its third compliance filing pushed implementation to February 2028. MISO is implementing in phases: Phase 1 by June 2027, Phase 2 by June 2029. SPP targets Q2 2030. ERCOT is not subject to Order 2222 because it falls outside FERC jurisdiction (Texas operates a separate grid not connected to the eastern or western interconnections), but Texas has implemented its own DER aggregation framework through Public Utility Commission of Texas pilot programs.

What this means for commercial DER owners

For commercial and industrial facilities with behind-the-meter solar, battery storage, demand response capability, or controllable loads, Order 2222 creates a new revenue pathway. Through a DERA, the facility's DER can participate in wholesale capacity auctions, day-ahead and real-time energy markets, frequency regulation, operating reserves, and other services — earning revenue streams beyond simple retail rate offset.

The catch: actual revenue depends on local market conditions, the DERA's bidding strategy, and how DERA payments compare to alternative state retail programs. In many regions, behind-the-meter incentives (net metering, demand response retail programs, SGIP-style state subsidies) currently pay more than wholesale market participation through a DERA. This is changing as capacity prices in PJM, NYISO, and ISO-NE rise to record highs — making wholesale capacity payments increasingly competitive with retail program payments. C&I facilities with substantial DER fleets should evaluate both pathways as implementation progresses in their region.

Common questions

What is FERC Order 2222?
FERC Order 2222, issued in September 2020, requires regional grid operators to allow distributed energy resource (DER) aggregations to participate in wholesale electricity markets — capacity, energy, and ancillary services. The Order removes barriers preventing small distributed resources like rooftop solar, behind-the-meter batteries, demand response, and electric vehicles from competing alongside traditional power plants when bundled as aggregations meeting minimum size of 100 kW.
What is a DER aggregator (DERA)?
A DER aggregator (DERA) is a market participant that pools multiple distributed energy resources from different customers into a single resource of sufficient size to participate in wholesale markets. The aggregator handles wholesale market registration, bidding, settlement, and revenue distribution back to individual DER owners. DERAs may include independent power marketers, utilities, software companies, and demand response providers.
When will FERC Order 2222 be implemented across ISOs?
CAISO has implemented its compliance program. NYISO targets full implementation by end of 2026. ISO-NE targets November 1, 2026 for energy markets, with capacity market participation beginning February 1, 2027. PJM is implementing in February 2028. MISO is implementing in phases — Phase 1 June 2027, Phase 2 June 2029. SPP targets Q2 2030. ERCOT is not subject to Order 2222 since it falls outside FERC jurisdiction.
Does FERC Order 2222 apply to ERCOT?
No, FERC Order 2222 does not apply to ERCOT because ERCOT operates outside FERC jurisdiction. However, Texas has implemented its own framework for DER aggregation through PUCT pilot programs. Distributed resources in ERCOT can participate in ERCOT's energy and ancillary service markets through these state-level pathways, though the participation rules differ from those required by FERC Order 2222.
How can commercial DER owners benefit from FERC Order 2222?
Commercial DER owners — those with behind-the-meter solar, batteries, demand response capability, or controllable loads — can participate in wholesale markets through DERAs, earning revenue for services beyond retail rate offset. Potential revenue streams include capacity payments, energy market arbitrage, frequency regulation, operating reserves, and other ancillary services. The aggregator handles market complexity in exchange for a margin on revenues.

Want to put this knowledge to work?

Learn about Energy Procurement Talk to an Advisor

Need help navigating this topic?

Pilot Energy’s advocacy team can help you make sense of the energy landscape and build a strategy that works for your organization.

Talk to an Advisor

Tag:

Policy



Related Articles

It is a long established fact that a reader will be distracted by the readable content of a page when looking at its layout.

NEPA & transmission permitting

On a napkin Why transmission takes 10+ years — and what Order 1920 changes Typical major transmission line — 10–15 years Planning 2–4 yrs Siting + permits 3–5 yrs NEPA review 2–3 yrs Litigation 0–3 yrs Construction 2–3 yrs ←————— process, not physical work

RGGI & state carbon markets

On a napkin RGGI Auction Clearing Price ($/ton CO2) $25 $20 $10 $0 2018 2021 2022 $13.90 2024 $25.75 2025 $22.09 avg Mar 2026 $24.99 record high RGGI member states (May 2026) CT · DE · ME · MD · MA · NH · NJ · NY · RI · VT • VA rejoining H2 2026

Retail deregulation

On a napkin Vertically integrated (most of US) Generation Transmission + distribution Retail sales One utility owns & sells everything SE · NW · most of SW · most of West (non-CA) Deregulated / restructured Competitive generation (ISO market) Regulated T&D (utility /

Pilot Energy Background

Ready to take control of your energy strategy?

Pilot Energy has spent 25 years helping commercial and industrial organizations navigate complex energy markets. Let our advocacy team put that experience to work for you.